135.00
135.0 USD 135.00
0.00
Responsible Omar abdelaziz hassan
Last Update 08/01/2026
Completion Time 4 hours 31 minutes
Members 109
  • Unit 04: Project Structuring & Work Breakdown Architecture
    5Lessons ·
    • Structuring Projects (1)
    • Structuring Projects (2)
    • Types of Projects Vs. Scale of Projects
    • Drawing Project Structures in Primavera
    • Unit 04 Material
Planning & Control Using Primavera P6

Structuring Projects (1)

Unit 04: Project Structuring & Work Breakdown Architecture
View all
Planning & Control Using Primavera P6
Structuring Projects (1)
Planning & Control Using Primavera P6
Structuring Projects (2)
Planning & Control Using Primavera P6
Types of Projects Vs. Scale of Projects
Planning & Control Using Primavera P6
Drawing Project Structures in Primavera
Planning & Control Using Primavera P6
Unit 04 Material