StormCAD Program
Course Unavailable
| Responsible | Mohamed Ali Moahmed Abd Elkareem |
|---|---|
| Last Update | 20/11/2025 |
| Completion Time | 5 hours 16 minutes |
| Members | 3 |
Share This Course
Share Link
Share on Social Media
Share by Email
Please login to share this StormCAD Program by email.
-
Practice Files1Lessons ·
-
StormCAD Training Files
-
-
Unit 1: Design and Implementation of the Septic Tank10Lessons · 1 hr 18 min
-
Catch Basin Design
-
Pipes Design
-
Gullies (1)
-
Gullies (2)
-
Gullies (3)
-
Gullies (4)
-
Hydro Design (1)
-
Hydro Design (2)
-
Catchment Area Analysis
-
Free Preview
-
-
Unit 2: Road Design and Hydrological Considerations9Lessons · 1 hr 13 min
-
Brief about Roads (1)
-
Brief about Roads (2)
-
Brief about Roads (3)
-
Brief about Roads (4)
-
Brief about Roads (5)
-
Water Depth (1)
-
Water Depth (2)
-
Water Depth (3)
-
Free Preview
-
-
Unit 3: Network Planning and Hydrological Considerations in Design12Lessons · 1 hr 31 min
-
Network Planning (1)
-
Network Planning (2)
-
Network Planning (3)
-
Network Planning (4)
-
Network Planning (5)
-
Design Constraints
-
Rational Method
-
Storm Data
-
Time of Concentration
-
Catchment Area (1)
-
Catchment Area (2)
-
Free Preview
-
-
Unit 4: Septic Tank and Manhole Design Considerations5Lessons · 42 min
-
Linking between Catch Basin & Manhole (1)
-
Linking between Catch Basin & Manhole (2)
-
Put the Data of the Rational Method
-
Check Flex Table Conduit & Outfall
-
Study the Plan
-
-
Unit 5: Practical Examples and Design Alternatives4Lessons · 32 min
-
Real Example
-
Alternatives
-
Rain Depth
-
Alternatives & Base Calculation Options
-
StormCAD Training Files
Practice Files
View all
StormCAD Training Files
00:00
0
0
Unit 1: Design and Implementation of the Septic Tank
View all
Catch Basin Design
00:07
0
0
Pipes Design
00:07
0
0
Gullies (1)
00:08
0
0
Gullies (2)
00:08
0
0
Gullies (3)
00:06
0
0
Gullies (4)
00:10
0
0
Hydro Design (1)
00:11
0
0
Hydro Design (2)
00:12
0
0
Catchment Area Analysis
00:09
0
0
Unit 2: Road Design and Hydrological Considerations
View all
Brief about Roads (1)
00:10
0
0
Brief about Roads (2)
00:07
0
0
Brief about Roads (3)
00:11
0
0
Brief about Roads (4)
00:11
0
0
Brief about Roads (5)
00:07
0
0
Water Depth (1)
00:09
0
0
Water Depth (2)
00:09
0
0
Water Depth (3)
00:09
0
0
Unit 3: Network Planning and Hydrological Considerations in Design
View all
Network Planning (1)
00:09
0
0
Network Planning (2)
00:07
0
0
Network Planning (3)
00:05
0
0
Network Planning (4)
00:09
0
0
Network Planning (5)
00:10
0
0
Design Constraints
00:08
0
0
Rational Method
00:06
0
0
Storm Data
00:09
0
0
Time of Concentration
00:13
0
0
Catchment Area (1)
00:06
0
0
Catchment Area (2)
00:09
0
0
Unit 4: Septic Tank and Manhole Design Considerations
View all
Linking between Catch Basin & Manhole (1)
00:12
0
0
Linking between Catch Basin & Manhole (2)
00:05
0
0
Put the Data of the Rational Method
00:04
0
0
Check Flex Table Conduit & Outfall
00:11
0
0
Study the Plan
00:10
0
0
Unit 5: Practical Examples and Design Alternatives
View all
Real Example
00:05
0
0
Alternatives
00:07
0
0
Rain Depth
00:07
0
0
Alternatives & Base Calculation Options
00:13
0
0