Course Unavailable
Responsible Mohamed Ali Moahmed Abd Elkareem
Last Update 20/11/2025
Completion Time 5 hours 16 minutes
Members 5
  • Unit 4: Septic Tank and Manhole Design Considerations
    5Lessons · 42 min
    • Linking between Catch Basin & Manhole (1)
    • Linking between Catch Basin & Manhole (2)
    • Put the Data of the Rational Method
    • Check Flex Table Conduit & Outfall
    • Study the Plan
StormCAD Program

Linking between Catch Basin & Manhole (1)

Unit 4: Septic Tank and Manhole Design Considerations
View all
StormCAD Program
Linking between Catch Basin & Manhole (1)
StormCAD Program
Linking between Catch Basin & Manhole (2)
StormCAD Program
Put the Data of the Rational Method
StormCAD Program
Check Flex Table Conduit & Outfall
StormCAD Program
Study the Plan