Course Unavailable
Responsible Mohamed Ali Moahmed Abd Elkareem
Last Update 20/11/2025
Completion Time 5 hours 16 minutes
Members 5
  • Unit 1: Design and Implementation of the Septic Tank
    10Lessons · 1 hr 18 min
    • Catch Basin Design
    • Pipes Design
    • Gullies (1)
    • Gullies (2)
    • Gullies (3)
    • Gullies (4)
    • Hydro Design (1)
    • Hydro Design (2)
    • Catchment Area Analysis
    • Free Preview
StormCAD Program

Catch Basin Design

Unit 1: Design and Implementation of the Septic Tank
View all
StormCAD Program
Catch Basin Design
StormCAD Program
Pipes Design
StormCAD Program
Gullies (1)
StormCAD Program
Gullies (2)
StormCAD Program
Gullies (3)
StormCAD Program
Gullies (4)
StormCAD Program
Hydro Design (1)
StormCAD Program
Hydro Design (2)
StormCAD Program
Catchment Area Analysis
Unit 01 Material