StormCAD Program
Course Unavailable
| Responsible | Mohamed Ali Moahmed Abd Elkareem |
|---|---|
| Last Update | 20/11/2025 |
| Completion Time | 5 hours 16 minutes |
| Members | 5 |
Share This Course
Share Link
Share on Social Media
Share by Email
Please login to share this StormCAD Program by email.
-
Unit 4: Septic Tank and Manhole Design Considerations5Lessons · 42 min
-
Linking between Catch Basin & Manhole (1)
-
Linking between Catch Basin & Manhole (2)
-
Put the Data of the Rational Method
-
Check Flex Table Conduit & Outfall
-
Study the Plan
-
Linking between Catch Basin & Manhole (1)
Unit 4: Septic Tank and Manhole Design Considerations
View all
Linking between Catch Basin & Manhole (1)
00:12
0
0
Linking between Catch Basin & Manhole (2)
00:05
0
0
Put the Data of the Rational Method
00:04
0
0
Check Flex Table Conduit & Outfall
00:11
0
0
Study the Plan
00:10
0
0